Projects
At the Mine

Rirhandzu Colliery
• Estimated 6 939 385 mineable resources in situ
• Mining Method: Opencast
• Life of mine: 8years
• Rehabilitation

Boschpoort Colliery
• 2 202 314 mineable resource tonnes in situ
• Method of mining: Opencast
• Life of mine: 5years
• Mining right has been granted

Maboko Colliery
• An estimated total of 11 073 051 tonnes of mineable resources in situ
• Life of Mine: 10 years
• Method of mining is opencast
• Mining Operation

Roodepoort
• A total of 48 672 355 tonnes of mineable resources in situ
• Life of Mine: 15 years
• Method of mining is a combination of opencast and underground
• Status of mining right at time of publishing: the mining right has been granted and executed